Your Go-To Project Guide: From Beginning to End
Part I: Coming Up With Good Ideas
A project's success starts long before the work begins; it's decided when the idea is first created. Good projects come from a careful process of thinking up creative ideas, checking them thoroughly, and choosing the best one. This first step is often rushed, but it's the most important. It's where you first imagine what the project can achieve and where you can prevent the biggest problems with the least amount of effort. This section gives you a complete guide for this crucial first stage. It covers methods for generating many creative ideas and the tools needed to pick the single best one to move forward with. By learning how to come up with and evaluate ideas, teams can make sure they are not just doing projects well, but doing the right projects.
Chapter 1: A Guide to Brainstorming Techniques
Creativity isn't something that just happens; it's a skill you can build. The best project ideas come from organized sessions that encourage different ways of thinking and challenge old assumptions. This chapter offers a list of brainstorming techniques, sorted by what they help you do: come up with many new ideas (thinking broadly), improve and analyze ideas you already have (thinking narrowly), and get unstuck when you can't think of anything new.
1.1 Getting Ready to Be Creative
Good brainstorming sessions don't just happen. They are the result of good preparation and the right environment. The idea that you can be creative on the spot is mostly a myth; it's very hard to come up with new ideas under pressure.1 A great first step is to give people the topic or problem long before the meeting. This gives everyone time to think about it, do a little research, and form their own thoughts. This way, the group has more and better ideas to work with when they meet.1
The meeting environment is also very important. A common problem in brainstorming is "anchoring," which is when the group gets stuck on the first few ideas that are shared, stopping more original thoughts from coming out.2 To fight this, it's important to create a friendly and supportive space where all ideas are welcomed without criticism at first. This helps everyone feel safe to share, no matter their position, and stops unusual ideas from being shot down too early. Inviting people from other teams or with different backgrounds can also bring in fresh points of view and break up old ways of thinking.1 Changing the location, like moving to a new room or going outside, can also help by breaking up routines.1
1.2 Basic Techniques for Generating Lots of Ideas
The goal of this stage is to think broadly and come up with as many ideas as possible. You're not looking for quality yet, just quantity. This gives you a lot of raw material to work with later.
Mind Mapping: This is a visual tool for exploring a problem and organizing ideas. You start with a central question, like "How can we improve our customer response times?", in the middle of a whiteboard or a large piece of paper.3 From there, you draw lines to new bubbles with related ideas and solutions. Each new idea can then become a center for more branches. This free-flowing structure helps prevent the "anchoring" problem because the first ideas are used to spark new and related thoughts.2 The final diagram might look messy, but it's a picture of the group's collective thinking, ready to be looked at for good ideas.3 Digital tools like MindMeister or Miro can help with this, especially for teams working from different locations.4
Brainwriting: This is a quiet, written method that helps make sure everyone's ideas are heard, especially from quieter team members. In a brainwriting session, each person writes down three ideas on a piece of paper in a few minutes.1 Then, the papers are passed to the person next to them, who adds to the ideas or writes down new ones. This continues for a few rounds. Because people are writing instead of talking, it reduces the influence of loud personalities and encourages more people to contribute.
Rapid Ideation: This technique focuses on getting a large number of ideas in a very short amount of time. The team is challenged to come up with as many ideas as they can, no matter how wild, in a quick burst.1 The focus on speed helps people stop self-censoring and write down even half-formed thoughts. This creates a big, unfiltered list of ideas that can be sorted through later, increasing the chances of finding a truly new solution.
1.3 Techniques for Analyzing and Choosing the Best Ideas
After you have a lot of ideas, you need to switch from generating to analyzing. This stage is about looking closely at the best ideas, questioning them, and refining them to see if they are solid. Moving forward with an idea that hasn't been properly checked is a major project risk.
Starbursting: This technique is used to fully examine one promising idea.1 The idea is placed in the middle of a six-pointed star. Each point of the star stands for a type of question: Who, What, When, Where, Why, and How.2 The team then comes up with questions for each category, like "Who is this product for?", "What problems might we face?", "When should we launch?", "Where will this be used?", "Why is this better than other options?", and "How will we do this?".1 This structured questioning forces the team to look at the idea from all angles and find weaknesses before spending a lot of time and money on it.
The Five Whys: This simple but powerful technique helps you find the real cause of a problem. You start with a problem and ask "Why?" at least five times to get to the root of the issue.2 For example, if the problem is "The website crashed," the first "why" might be "Because a server was overloaded." The next "why" could be "Because of a surprise increase in visitors," and so on, until you find the root cause, like not having a system that can handle big traffic spikes. This makes sure your project solves the real problem, not just a symptom. You can organize this analysis with a fishbone diagram.2
Drivers Analysis: Similar to the Five Whys, this technique focuses on finding the "drivers" or causes of a problem.2 The team repeatedly asks, "What's driving [the problem]?" and then, "What's driving [the answer to that question]?" This breaks down the causes step-by-step and helps the team get a deep, shared understanding of the situation.2
The best way to come up with ideas is to use a mix of these techniques. A common mistake is to only use methods like mind mapping to generate ideas. This can create excitement, but without using analytical techniques like Starbursting or the Five Whys, the team might end up chasing an idea that isn't well thought out or doesn't solve the right problem. A good project template should recommend a two-step process: first, use techniques to generate a lot of ideas, and second, use techniques to test and confirm the best ones.
1.4 Creative Ways to Get Unstuck
Sometimes, even with a good process, teams get stuck and can't think of new ideas. The following techniques are designed to break old thinking patterns and bring in fresh perspectives.
Reverse Brainstorming: This technique flips the problem around. Instead of asking, "How can we solve this problem?", the team asks, "How could we cause this problem, or make it worse?".6 For example, a team that wants to get more sales leads would instead brainstorm how to get
fewer leads. This might lead to ideas like "Remove all 'buy now' buttons" or "Use confusing language".6 After making a list of these negative ideas, the team flips them to create powerful, positive solutions: "Use clear 'buy now' buttons on every page" and "Use exciting and clear language".6 This method is great for finding potential problems and helping a team think in new ways to find breakthrough solutions.7SCAMPER: This technique uses a checklist of seven words to spark different ways of thinking about an idea or product: Substitute, Combine, Adapt, Modify, Put to another use, Eliminate, and Reverse.9 Each letter gives you a set of questions to ask 10:
Substitute: What can be swapped or replaced? (e.g., using plant-based ingredients instead of meat).10
Combine: What ideas or features can be merged? (e.g., the smartphone, which combined a phone, camera, and music player).10
Adapt: How can we adjust this for a new situation?.10
Modify (or Magnify/Minify): What can be made bigger or smaller? (e.g., changing a logo's color to change how people see the brand).10
Put to another use: How can this be used for something else? (e.g., Adidas using recycled ocean plastic to make shoes).10
Eliminate: What can be removed or simplified? (e.g., removing wires to create Bluetooth headphones).10
Reverse: What if we did this backward or in a different order?.10
SCAMPER gives you a structured way to challenge your assumptions and find new improvements or uses for your ideas.11
Figure Storming: This is a role-playing technique where the team pretends to be a famous person, like a well-known CEO or a historical figure, and discusses how that person would solve the problem.1 By asking, "What would [figure's name] do?", the team is forced to think differently, which can lead to more creative solutions.
To help you choose the right method, the following table gives an overview of the key brainstorming techniques.
Chapter 2: Testing if Ideas Are Workable - Evaluating and Prioritizing
After you've generated a lot of ideas, the next step is to filter them through careful analysis. This chapter introduces organized, data-based methods to check if each idea is practical and valuable. This process makes sure that the project you choose is not just creative, but also smart, doable, and in line with your company's goals. Skipping this step is a sure way to waste time and money on projects that are doomed to fail.
2.1 The Basics: Checking for Impact and Feasibility
Before comparing ideas, each one must pass a basic test to see if it's even possible. This is done with a feasibility study, which is a formal check of a project's practicality before you invest a lot of time and money.12 A feasibility study is a key part of managing risk because it helps you spot potential problems early on, so you can deal with them before they get bigger.12
A good feasibility study looks at a project from five key angles:
Technical Feasibility: This looks at the technology and skills your company has. It asks questions like: Do we have the right technology? Does our team have the skills to build this? Is our current setup good enough to support it?.14
Economic Feasibility: This involves a cost-benefit analysis to see if the project makes financial sense. It answers whether the project will provide a good return on investment (ROI).13 This includes estimating all costs (people, technology, materials) and the money or value it will bring in.13
Legal Feasibility: This checks if any part of the project breaks laws or regulations. This could include zoning laws, data privacy rules, or other industry-specific regulations.14 A project can be stopped by legal problems even if it's technically and financially sound.
Operational Feasibility: This looks at how well the project fits with your company's current operations. It considers the impact on how you do business, your workflows, and your staff. The main question is: can the company actually use the solution once it's built?.12
Scheduling Feasibility: This checks if the project can be finished in a realistic and necessary amount of time.12 It looks at deadlines and whether you have enough resources to meet them.
Once you have a list of ideas that seem possible, the Impact-Feasibility Matrix is a simple but powerful tool for a first round of prioritizing. This tool helps you plot each idea on a simple grid, with "Impact" on one side and "Feasibility" (or how easy it is to do) on the other.15 This helps teams decide where to put their limited time and money to get the best results.15 The matrix divides ideas into four boxes:
Quick Wins (High Impact, High Feasibility): These are the "low-hanging fruit." They offer a lot of value and are easy to do. These should be your top priority.15
Major Projects (High Impact, Low Feasibility): These ideas offer big rewards but are hard to do and require a lot of time, money, or people. They are important projects that need careful planning and new investment.15
Busy Work (Low Impact, High Feasibility): These are tasks that are easy to do but don't offer much value. They can be useful to fill in time, but they shouldn't be your main focus because they can distract you from more important work.15
Resource Drains (Low Impact, Low Feasibility): These ideas are hard to do and offer little reward. You should avoid these completely.15
2.2 Advanced Tools for Strategic Prioritizing
The Impact-Feasibility Matrix is great for a quick sort, but for more complex projects, you often need better tools. These methods provide a structured way to rank projects based on more criteria.16
The RICE Framework: This scoring method evaluates projects on four factors: Reach, Impact, Confidence, and Effort. It's great for teams that need to balance potential value with how hard a project is to do.16
Reach: How many people will this project affect in a certain time period?
Impact: How much will this project affect each person? (Often scored on a scale, like 3 for huge impact, 0.5 for low impact).
Confidence: How sure are you about your estimates for Reach and Impact? (Expressed as a percentage, like 100% for high confidence).
Effort: How much total time will this take from all team members? (e.g., person-months).
The final RICE score is calculated as:
(Reach×Impact×Confidence)÷Effort
. This helps you have a more objective, data-based discussion about which projects give you the most bang for your buck.16
The MoSCoW Method: This is a simple way to prioritize tasks, often used in fast-moving projects. It sorts tasks into four groups.16
Must-Have: These are things the project absolutely cannot do without. The project would be a failure if these aren't included.
Should-Have: These are important and add a lot of value, but the project can still succeed without them.
Could-Have: These are "nice-to-have" features that have a smaller impact. They'll only be included if there's extra time and money.
Won't-Have (for now): These are things that are definitely not being included in this version of the project, but might be considered later.
The MoSCoW method forces teams to have important conversations and make tough choices about what really matters, making sure the most important things get done first.16
The Eisenhower Matrix: Often used for managing your own time, this tool can also be used to prioritize projects. It helps teams tell the difference between work that is truly important and work that just feels urgent.16 Projects are sorted into four boxes:
Urgent and Important (Do First): Crises or projects with immediate, high-value deadlines.
Important but Not Urgent (Schedule): Big-picture projects, long-term planning, and building relationships. This is often where the most valuable work is.
Urgent but Not Important (Delegate): Distractions that need attention but don't add much value.
Not Urgent and Not Important (Eliminate): Time-wasting activities that should be dropped.
Using this matrix helps companies avoid constantly putting out fires and instead focus on projects that will lead to long-term success.17
2.3 Making Sure It Fits the Company's Goals
The last and most important check is to see if the project aligns with the company's main goals. A project can be doable and a high priority, but if it doesn't help the company's overall strategy, it's a mistake.17 Every potential project must be checked to see if it delivers real business value, such as:
Making money directly.
Improving the company's brand and reputation.
Making customers happier and more loyal.
Making internal work more efficient and cutting costs.
Building key business relationships or entering new markets.17
To make sure a project is aligned, you should be able to answer questions like: What is our company's main purpose, and how does this project help? What brand image are we trying to build, and does this project fit? What are our main goals for the next five years, and does this project help us get there?.17 For example, a project to redesign a website might not have business value if the current site is already doing a great job. But an internal project to make operations more efficient has clear business value if it saves money and frees up people for more important work.17
Choosing a project shouldn't be a single decision but a filtering process. An idea must first pass the "Can we do this?" test. Then, the ones that pass are ranked using a tool like RICE or MoSCoW ("Which of these should we do?"). Finally, the top-ranked ideas are checked against the company's goals ("Why should we do this?"). This structured process stops companies from wasting money on projects that are just "doable" and makes sure they focus on projects that are doable, high-priority, and strategically important.
To help you choose the right tool for this process, the following table compares the main prioritization methods.
Part II: Creating a Solid Plan
Once an idea has been tested and chosen, it becomes a real project. This is the start of the planning phase, which is the most important stage for determining if a project will succeed or fail. Good planning is the foundation that good work is built on.18 It's the process of creating a detailed map that turns the "what" and "why" of the project into the "how," "who," "when," and "how much." This section provides the blueprint for this work, covering the key documents and ways of thinking needed to build a strong project plan. From setting clear goals to breaking down complex work and planning for problems, these chapters lay the groundwork for turning a good idea into a real thing.
Chapter 3: Setting the Destination - How to Create SMART Goals
The very first step in any project plan is to define its goal. A project without a clear goal is like a ship without a rudder—it will drift aimlessly and is bound to fail. Vague goals like "improve teamwork" or "make more money" are useless because they are unclear, don't create any drive, and make it impossible to know when you're done.19 The solution to this problem is the
SMART goals framework, a simple but powerful tool for creating goals that are clear, focused, and motivating.20
3.1 The Power of Being Clear: Why Vague Goals Don't Work
Projects with unclear goals have many problems. They lack direction, which makes it hard for the team to know what to work on first. They are likely to experience "scope creep," where new tasks are added on because there are no clear boundaries.18 And they make it impossible to measure success, which leads to arguments and a feeling that the project is never truly finished. The SMART framework was created to solve these problems by giving you a checklist for setting goals, making sure every goal is strong and can be acted on.21 The name SMART, which comes from a 1981 article by George T. Doran, stands for Specific, Measurable, Achievable, Relevant, and Time-bound.21
3.2 Breaking Down the SMART Acronym
To be useful, a project goal must meet all five SMART criteria. The process of applying these criteria turns a fuzzy idea into a solid target.
Specific: The goal must be clear and well-defined. It should answer the basic "W" questions: What do you want to do? Who is involved? Why is it important?.19 A specific goal leaves no doubt about what needs to be done.
Weak Goal: "Improve the company website."
Specific Goal: "Launch a new, mobile-friendly checkout process for our online store."
Measurable: The goal must be something you can count or measure. There must be specific numbers or metrics that let you track your progress and know when you've succeeded.22 If you can't measure a goal, you'll never know if you've reached it.
Weak Goal: "Reduce the number of people who leave their shopping carts."
Measurable Goal: "Reduce the shopping cart abandonment rate by 15% from its current level of 40%."
Achievable (or Attainable): The goal must be realistic and possible to do. While goals should be challenging, setting goals that are impossible to reach just discourages the team and hurts productivity.20 This step forces you to think practically about the time, money, and resources you have.
Unachievable Goal: "Fix all software bugs in 24 hours."
Achievable Goal: "Reduce the number of critical bugs reported by customers by 50% in the next two-week work cycle."
Relevant: The goal must matter. It should fit with the bigger goals of your team, department, and the whole company.20 A relevant goal makes sure that the project's work is contributing to a larger purpose and isn't just a random task.
Irrelevant Goal: "Design a new logo for the IT department" (if the company's main goal is to grow its market share).
Relevant Goal: "Set up a new customer relationship management (CRM) system to help the sales team increase their lead conversion rate by 10%, which directly helps the company's goal of growing its market share."
Time-bound (or Time-based): The goal must have a deadline or a specific timeframe for completion. A deadline creates a sense of urgency, helps focus the team's efforts, and stops the goal from getting lost in everyday tasks.19
Weak Goal: "Train the sales team on the new CRM system."
Time-bound Goal: "Complete training for 100% of the sales team on the new CRM system by the end of the third quarter."
3.3 SMART Goals in Action: Examples
When you put all five elements together, you get a powerful goal that guides the whole project.
Weak Goal: "Stop going over budget."
SMART Goal: "To reduce project cost overruns, I will use a new budget tracking process and have weekly budget meetings for the 'Phoenix' project, making sure the final cost is within 2% of the approved $500,000 budget by the project's end date of December 31st." 19
Weak Goal: "Eliminate scope creep."
SMART Goal: "For the next project, I will reduce scope creep by holding a MoSCoW priority meeting with all key people during the planning stage and checking for unapproved changes in weekly meetings, with the goal of keeping changes to less than 5% of the original project scope." 19
Setting a SMART goal isn't just a first step in project planning; it's the foundation that determines the quality of everything that comes after. The "Specific" and "Measurable" parts of a good SMART goal directly feed into two of the most important project documents: the Work Breakdown Structure (WBS) and the project's Key Performance Indicators (KPIs). The "Specific" part—the clear outcome—becomes the main goal of the WBS. The "Measurable" part—the target number—becomes the main KPI you track. So, if you don't write a strong SMART goal, you'll end up with a vague WBS and meaningless KPIs, which cripples your project's planning from the start. This shows a direct link between how clear your goal is and how manageable your project will be.
Chapter 4: Breaking Down the Work - Using the Work Breakdown Structure (WBS)
Once you have a clear, SMART goal, the next step is to turn that high-level goal into a detailed list of all the work needed to achieve it. This is what the Work Breakdown Structure (WBS) is for. The WBS is like the central nervous system of your project plan. It's a chart that breaks down the total project work into smaller, more manageable pieces.23 It serves as the official map for the project, making sure that every task is identified, organized, and understood by the whole team and everyone else involved.24
4.1 What is a WBS? The Blueprint for Your Project
A WBS is not a schedule or a to-do list; it's a breakdown of the project based on what needs to be delivered. It starts with the final result of the project and breaks it down into smaller and smaller pieces until the work is detailed enough to be easily estimated and managed.24 How detailed your WBS needs to be depends on how complex your project is and how much control you need. Projects that can't afford delays or to go over budget, like in construction or engineering, need a very detailed WBS and careful tracking.23
The WBS has three main purposes:
Describe the Work: It gives a complete and clear description of all the work in the project by breaking it down into tasks.23
Schedule the Work: It provides the foundation for creating the project schedule by identifying all the tasks that need to be planned and put in order.23
Estimate the Cost: It helps you estimate costs accurately by letting you calculate the cost for each small piece of work.23
4.2 The Parts of a WBS
The WBS is organized in levels, with each level showing more detail. A typical structure includes 25:
Level 1: The Project Goal / Final Result: This is the top level of the WBS and is the same as the overall project goal from your SMART goal. For example: "Launch a Targeted Content Campaign".25
Level 2: Major Deliverables or Phases: This level breaks the project into its main parts or stages. These often match up with major work areas, departments, or phases of the project.25 For the content campaign example, Level 2 parts might include: "Downloadable Materials," "Email Campaign," "Webpages," and "Social Media".24
Level 3: Sub-deliverables: Each major part is broken down further into smaller, more concrete results. For the "Downloadable Materials" part, sub-deliverables could include: "White Paper," "Case Study," and "Infographic".24
Level 4+: Work Packages: This is the lowest and most important level of the WBS. A work package is the smallest piece of work that can be confidently estimated and managed. It's a specific, assignable chunk of work with a clear result.24 For the "White Paper" sub-deliverable, work packages might include: "Do Research," "Write First Draft," "Design and Layout," and "Final Proofreading."
4.3 How to Create a WBS: A Step-by-Step Guide
Creating a good WBS is a team effort that needs input from the project team and key people involved. The process usually follows these steps:
Define Project Scope and Goals: Start with your approved SMART goal and the overall project charter. This gives you the Level 1 entry for your WBS.24 It's very important to clear up any confusion about what the project will deliver, what resources you have, or any limitations at this stage to avoid problems later.25
Identify Major Deliverables: Work with your team and key people to identify the main results needed to achieve the project goal. This becomes Level 2 of your WBS.24
Break Down Deliverables: Break down each major deliverable from Level 2 into its smaller parts. Keep breaking them down until the pieces are small enough to be managed easily.24
Identify Work Packages: Continue breaking down the work until you get to the work package level. A key rule here is the "100% Rule": all the work in the lower levels must add up to 100% of the work in the level above it. The entire WBS must cover 100% of the project's work—no more, and no less.
Define Activities (Optional but Recommended): While not officially part of the WBS (which focuses on deliverables), it's a good practice to list the specific activities or tasks needed to complete each work package. For example, the "Write First Draft" work package might include activities like "Outline the structure," "Write the introduction," and "Draft the main content".24 This detailed list of activities is what you'll use to create the project schedule.
Review and Approve: Once the WBS is drafted, it must be reviewed and approved by all key people. This makes sure everyone has the same understanding of the project's scope and agrees on what is included—and just as importantly, what is not.25
The WBS is much more than just an organization chart for your project's work. It's the bridge that connects the project's what (the goal) to its how (the schedule), who (the resources), and how much (the budget). A WBS that is incomplete or poorly defined is the most common reason for the three main causes of project failure: scope creep, going over budget, and schedule delays. When the WBS is complete and agreed upon, any new work that is requested but not in the WBS is clearly "scope creep," not a "missed task".26 Also, since you estimate resources and costs for each work package 23, any missing work packages in the WBS will lead to an underestimation of the time and money needed. Therefore, the quality and completeness of the WBS directly affect the accuracy of the project's schedule, resource plan, and budget. It is the single point of control for the classic "triple constraint" of project management (scope, time, and cost).
Chapter 5: Getting Your Team and Tools Ready - A Guide to Resource Management
With the Work Breakdown Structure (WBS) giving you a complete list of all the work to be done, the next step is to figure out what you need to do that work. This is what project resource management is all about: the process of planning, estimating, getting, and managing all the resources needed to finish a project successfully.27 Good resource management makes sure that the right resources are available at the right time and are used well, which prevents expensive delays and keeps the team from getting burned out.29
5.1 What Are Project Resources?
A common mistake is to think of resources as just people. But project resources include many different things, and you need to plan for all of them.30 The main types of resources are:
Human Resources (People): The people and their skills needed to do the work, from designers and engineers to project managers and support staff.27
Financial Resources (Money): The budget for the project, which covers all costs like salaries, materials, and equipment.27
Equipment and Machinery: The physical tools needed, like computers, software, or vehicles.29
Materials: The raw materials or supplies that will be used in the project.27
Facilities (Space): The physical places needed for the project, like offices, meeting rooms, or warehouses.31
Time: While it's also a limitation, time itself is a limited resource that must be planned and managed carefully.27
5.2 The Resource Management Process
Resource management isn't a one-time thing; it's a process that continues throughout the entire project. It can be broken down into several key stages 27:
Plan and Estimate Resources: This is the first step, where the project manager uses the WBS as a starting point.28 For each small piece of work (work package), the team estimates the type and amount of each resource needed. This results in a resource management plan, a document that explains how resources will be managed during the project.27
Acquire Resources: Once you know what you need, the next step is to get it. For people, this might mean assigning internal staff or hiring outside help if you don't have the right skills in-house.28 For other resources, it means buying or leasing the necessary equipment and materials.
Allocate and Schedule Resources: This stage involves assigning specific resources to the tasks in the WBS.28 Good allocation means matching people's skills to the right tasks.29 This is closely tied to project scheduling, because the availability of resources affects the project timeline.
Monitor and Control Resources: Once the project starts, the project manager must keep track of how resources are being used.27 This means checking timesheets, workloads, and spending to make sure they match the plan. The goal is to use resources in the best way possible, preventing situations where some team members are overworked while others don't have enough to do.28
5.3 Key Techniques and Best Practices
Several techniques are used in resource management to get the best results:
Resource Forecasting: This means predicting what resources you'll need in the future based on upcoming projects. Planning ahead allows a company to see potential skill gaps or resource shortages early and prepare for them, for example by hiring or training people.30
Resource Leveling: This technique is used when a key person is assigned too much work at once. To fix this, the project manager might delay some tasks until that person is free. This often makes the project take longer, but it ensures that the quality of work doesn't suffer because someone is overloaded.30
Resource Smoothing: This technique is used when the project's end date can't be changed. Instead of delaying tasks, the project manager adjusts tasks within their "float" time (the amount of time a task can be delayed without affecting the project's deadline) to even out how much work people have. This makes better use of resources without changing the project's end date.
Capacity Planning: This is the process of figuring out the maximum amount of work a team or company can handle with the resources it has.27 Knowing your capacity is key to making realistic promises and preventing the kind of over-commitment that leads to burnout and project failure.
Good resource management gives you a clear view of your entire workforce, letting you see who is available, what skills they have, and how much work they have.28 This clarity is the key to using your resources well, cutting costs, and delivering projects successfully.
Chapter 6: Dealing with the Unexpected - Planning for Risks and Communication
While the WBS and resource plan create the structure of a project, two other plans are key for handling the unexpected problems that always come up: the risk management plan and the communication plan. These are sometimes seen as "soft" planning, but they are actually very important for making a project strong. Planning for risks prepares the team for potential problems, while good communication makes sure everyone involved stays on the same page. These two plans work together to manage the human and outside factors that can often ruin even the best-laid plans.
6.1 Planning for Risks Before They Happen
Risk management is the process of identifying, analyzing, and responding to potential problems that could hurt a project.32 It's about dealing with problems
before they happen, not reacting to them in a panic.34 A good risk management process greatly increases the chances of project success by reducing the impact of unexpected events.29
The risk management process has several steps:
Identify Risks: The first step is to make a complete list of potential risks. This should be a team effort, involving the project team, key people, and experts to get different points of view.32 Risks can be in different categories, like strategic, operational, financial, technical, and legal.32 Brainstorming or looking at lessons from past projects can be helpful here. All identified risks are written down in a document called a
risk register.32Analyze Risks: Once you've identified the risks, you need to figure out how serious each one is. This is usually done by looking at two things: the probability (how likely it is to happen) and the impact (how bad it would be for the project if it did happen).32 This can be done with words (like Low, Medium, High) or with numbers.36 The results are often shown on a
risk matrix or heat map, which plots probability against impact, making it easy to see which risks are the most serious.32Prioritize Risks: Using the risk matrix, the team can decide which risks need the most attention. The focus should be on risks that are high-probability and high-impact, as these are the biggest threats to the project.32 A risk owner, the person in charge of watching and managing a specific risk, should be assigned to each high-priority risk.35
Plan How to Respond to Risks: For each high-priority risk, the team must come up with a plan. There are four main ways to deal with negative risks (threats) 36:
Avoid: Change the project plan to get rid of the risk completely. For example, choosing a technology that's already been proven to work instead of a new, experimental one to avoid the risk of technical failure.36
Mitigate (or Reduce): Take action to make the risk less likely to happen or less damaging if it does. For example, adding extra quality checks to reduce the risk of defects.36 This is the most common strategy.37
Transfer: Shift the financial impact of the risk to someone else. The most common example is buying insurance or hiring a specialized company to handle a high-risk part of the project.33
Accept: For low-priority risks, the team may choose to do nothing and just have a backup plan in case the risk happens. This is usually done when the cost of dealing with the risk is more than the potential damage.36
Monitor Risks: Risk management is not a one-time thing. The risk register must be checked and updated throughout the project. Regular risk review meetings should be held to track the status of current risks, identify new ones, and see how well the response plans are working.32
6.2 Planning for Good Communication
A project communication plan is a formal document that acts as a blueprint for how, when, and to whom project information will be shared.38 It's essential for managing what key people expect, preventing misunderstandings, and making sure everyone has the information they need to do their jobs well.41 Good communication can greatly reduce risks by helping to spot problems early and solve them quickly.42
The key parts of a good communication plan include:
Identifying Key People: The first step is to identify all the people involved in the project—the project team, sponsors, executives, customers, and outside partners—and figure out what information they need.39 What does each group need to know? What's the best way to communicate with them?
Information to be Shared: The plan should say what kind of information will be shared. This includes project status updates, schedule and budget reports, changes to the project, risks, and major achievements.38
Communication Methods: Define the tools and methods that will be used for different types of communication. For example, email might be used for formal updates to outside people, a tool like Slack for daily team questions, a project management tool like Asana for task-related updates, and video calls for team meetings.39
Frequency: Set a regular schedule for communications to create clear expectations. This could include daily stand-up meetings, weekly project status reports, and monthly reviews with key people.39
Owner/Responsibility: For each type of communication, the plan should clearly state who is in charge of creating and sharing the information. This creates accountability and makes sure communications are sent out consistently.40
The Risk Management Plan and the Communication Plan are not separate documents; they are closely connected. Many project risks are not technical but human: people having different expectations, key decision-makers not being on board, and uncontrolled "scope creep" from informal requests.26 A strong, well-executed communication plan is therefore one of the most powerful
risk reduction strategies a project manager has. By systematically defining what information is shared, with whom, and how often, the communication plan directly manages people's expectations and keeps everyone on the same page. This proactive management of information prevents the very people-related risks—misunderstandings, surprises, and lack of engagement—that the risk management plan would otherwise have to deal with. A good project planning process, therefore, treats these two plans as two sides of the same coin, working together to manage all kinds of project uncertainty.
Part III: Getting the Work Done - The Project Lifecycle in Action
With a solid plan ready, the project moves into the doing phase: execution. This is where the plan is turned into a real thing. This final part of the guide focuses on the process of doing the work, checking progress against the plan, and dealing with challenges as they come up. It covers the important choice of a work style that decides how the team will work together, the key practices for tracking and reporting progress, and the importance of properly closing the project and learning from it. This is the stage where leadership, discipline, and the ability to adapt are most important, guiding the project from its well-planned start to its successful finish and, finally, to creating knowledge for future projects.
Chapter 7: Choosing Your Work Style - Picking a Project Management Method
Once the planning is done, you have to make a big decision about how the project team will work together to get the job done. This is decided by the project management methodology you choose—a system of rules, tools, and practices for organizing work. There is no single "best" method; the right choice depends on the type of project, how stable its requirements are, and the environment it's in.43
7.1 The Two Main Approaches: Traditional vs. Agile
Project management methods can be grouped into two main types: traditional and Agile.43
Waterfall: This is the classic, traditional method, which follows a straight, step-by-step path.44 The project moves through a series of clear phases—like Requirements, Design, Building, Testing, and Maintenance—and each phase must be completely finished before the next one starts.45 This approach requires all project requirements to be fully defined and written down at the beginning, because making changes is hard and expensive once a phase is done.43
Best For: Waterfall works best for projects with clear, stable requirements that are not likely to change. It's a good fit for industries like construction or manufacturing, where the work has to happen in a specific order (for example, you have to build a foundation before you can put up walls).44
Agile: In contrast, Agile is an approach that is all about flexibility and making progress in small steps.43 Instead of one big, long-term plan, Agile breaks the project into small, adaptive work cycles, often called "sprints." At the end of each cycle, the team delivers a small, working piece of the product. This allows for frequent feedback and continuous changes to meet new requirements.44 Agile values working closely with the customer and responding to change over sticking to a strict plan.45
Best For: Agile is perfect for projects where requirements are expected to change, the scope is flexible, and regular customer feedback is needed for success. It's the most common method in software development and other fast-moving, innovative fields where being able to adapt quickly is a big advantage.43
7.2 A Closer Look at Agile Methods
"Agile" itself is a set of principles, not a single method. Within the Agile approach, several specific methods have been developed. The two most popular are Scrum and Kanban.44
Scrum: Scrum is a structured Agile method designed to help teams manage complex projects and deliver value in small steps. It has specific roles, meetings, and documents.45
Roles: The Product Owner (represents the customer's interests and manages the list of features), the Scrum Master (guides the process and removes problems), and the Development Team (a self-organizing group that does the work).
Events: Work is done in fixed-time cycles called Sprints (usually 2-4 weeks). Key meetings include Sprint Planning, Daily Stand-up (or Daily Scrum), Sprint Review, and Sprint Retrospective.
Artifacts: The Product Backlog (a prioritized list of all desired features), the Sprint Backlog (the items chosen for the current sprint), and the Increment (the usable piece of the product delivered at the end of a sprint).
Scrum's focus is on getting more work done faster by creating a disciplined but flexible rhythm of delivery.44
Kanban: Kanban is a visual Agile method that focuses on improving the flow of work and continuous improvement.43 Unlike Scrum's fixed-time sprints, Kanban is a continuous flow system.
Kanban Board: The heart of Kanban is a visual board with columns that represent the stages of work (e.g., "To Do," "In Progress," "Testing," "Done").44 Tasks are written on cards that move across the board.
Work-in-Progress (WIP) Limits: Kanban's key feature for improving flow is setting limits on the number of tasks that can be in any "in-progress" column at one time.43 This stops teams from getting overloaded, shows where work is getting stuck, and encourages the team to work together to keep things moving.
Focus on Flow: The main goal of Kanban is to reduce the time it takes for a task to go from start to finish and to make the workflow as efficient and predictable as possible.43
7.3 Making the Right Choice: A Decision Guide
Choosing the right method is very important and should be based on the specific needs of the project. Key things to consider include 43:
Clarity of Requirements: If requirements are clear, not likely to change, and fully understood from the start, Waterfall is a good choice. If requirements are expected to change or develop during the project, an Agile approach is better.
Scope Flexibility: If the project scope is fixed, Waterfall's structured approach works well. If the scope is expected to change or needs to be flexible, Agile's step-by-step nature is more suitable.
Customer Involvement: If customer feedback is only needed at major points, Waterfall can work. If continuous customer feedback is wanted to shape the final product, Agile is the clear choice.
Project Timeline: If a strict, predictable timeline is the top priority, Waterfall's detailed upfront planning can provide a clear map. If delivering working value to the customer as quickly as possible is more important, Agile's iterative deliveries are better.
The following table provides a comparison to help you choose the most appropriate method.
Chapter 8: Keeping Track of Progress - Monitoring, Tracking, and Reporting
Once a project is being worked on, the plan needs to be actively managed. Project tracking is the ongoing process of checking a project's progress against the original plan, comparing what's actually happening to what was planned.46 It's the system that lets project managers spot problems, deal with issues before they become crises, and keep everyone involved informed and on the same page. Good tracking is essential for keeping projects on time, on budget, and on track to deliver what they promised.46
8.1 The Purpose of Project Tracking
The main purpose of project tracking is to give a real-time view of a project's health and status. This visibility helps teams and managers to 46:
Stay on Schedule: By checking progress against key milestones, teams can see potential delays coming and take action, like moving resources around or adjusting the project's scope.46
Stay on Budget: Tracking expenses in real time helps control project spending and prevent going over budget, which is a major reason projects fail.46
Maximize Resources: Tracking workloads and task status helps managers spot bottlenecks and adjust who is doing what, making sure tasks are spread out evenly and no one is overworked.46
Reduce Risks: Continuous checking allows for the early spotting of potential risks and challenges, so they can be dealt with before they become big problems.48
Increase Accountability: When progress is tracked openly, team members have a clear understanding of their responsibilities, which leads to more ownership and commitment to meeting deadlines.48
8.2 Key Tracking Tools and Techniques
Modern project tracking uses a variety of visual tools that make it easier to understand complex information quickly. The most common tools include:
Gantt Charts: These are bar charts that show a visual timeline of the whole project. They are very useful for tracking how long tasks will take, their start and end dates, how tasks depend on each other, and key project milestones.46 Gantt charts are great for complex projects with clear steps and firm deadlines because they clearly show the "critical path"—the series of tasks that determines how long the project will take at a minimum.46
Kanban Boards: As mentioned in the last chapter, Kanban boards are visual tools that track the status of individual tasks as they move through a workflow (e.g., To Do, In Progress, Done). They are excellent for giving quick, real-time updates on what the team is working on and for managing the team's workload.46
Project Dashboards: Dashboards are real-time, high-level views of a project's health. They pull together key project data and show it in easy-to-read graphs and charts.47 A typical dashboard might show things like the overall percentage complete, how much of the budget has been spent, and the number of overdue tasks, giving an instant status report for key people.47
8.3 Essential Metrics and KPIs
To track progress well, you need to measure it against clear, pre-defined Key Performance Indicators (KPIs). These metrics give you objective data on how the project is doing.18
Progress Metrics:
Percent Complete: A simple and common metric that tracks how much of a task, milestone, or the whole project is finished. This can be tracked from 0-100%.46
Milestone Tracking: Checking the completion of major project milestones gives a high-level view of whether the project is moving forward as planned.47
Earned Value Management (EVM) Metrics: EVM is a powerful technique that combines scope, schedule, and cost into one system.
Schedule Variance (SV): Measures if the project is ahead of or behind schedule. It's calculated as
SV=EV−PV
(Earned Value - Planned Value). A positive SV is good (ahead of schedule); a negative SV is bad (behind schedule).46Cost Variance (CV): Measures if the project is over or under budget. It's calculated as
CV=EV−AC
(Earned Value - Actual Cost). A positive CV is good (under budget); a negative CV is bad (over budget).26Schedule Performance Index (SPI): A ratio that measures schedule efficiency.
SPI=EV/PV
. An SPI greater than 1 is good; less than 1 is bad.46Cost Performance Index (CPI): A ratio that measures cost efficiency.
CPI=EV/AC
. A CPI greater than 1 is good; less than 1 is bad.46
8.4 Reporting and Communication
Tracking data is useless if it's not shared effectively. Regular project status reports are essential for keeping everyone involved informed about the project's progress, challenges, and future outlook.47 These reports should be created consistently and shared according to the schedule and methods laid out in the project's communication plan. By providing open and regular updates, project managers can manage expectations, keep everyone on the same page, and create a collaborative environment where everyone is working from the same information.
Chapter 9: The Final Step - Closing the Project and Learning for the Future
The end of a project is just as important as its beginning. A common mistake is to just break up the team and move on once the final work is delivered. A formal project closure process is essential not just for keeping things tidy, but more importantly, for learning and getting better as an organization. This final chapter outlines the steps for formally closing a project and holding a post-mortem meeting, a key practice for turning the experiences of one project into wisdom for the next.
9.1 Formally Closing the Project
Project closure involves a series of administrative tasks to officially end the project. This makes sure that all loose ends are tied up and the project is properly filed away. Key steps include:
Getting Final Approval: Getting a formal sign-off from the client or project sponsor that the final work has been accepted and meets the agreed-upon requirements.
Finalizing Paperwork: Gathering and storing all project documents, including the project plan, WBS, risk register, status reports, and change logs.
Closing Contracts: Finalizing all payments and closing out any contracts with vendors, suppliers, or contractors.
Releasing the Team: Formally releasing the project team members and other resources so they can be assigned to new projects.
9.2 The Post-Mortem: Learning from Experience
The most valuable part of project closure is the post-mortem, also known as a project review or retrospective.51 This is a structured meeting where the project team and key people get together to reflect on the entire project.51 The main goal is to have a frank and honest discussion about what went well, what went wrong, and, most importantly,
why.51 The benefits of this are huge: it allows the organization to learn from its mistakes, fix problems in its work processes, celebrate successes, and improve teamwork for future projects.2
Holding a good post-mortem requires careful planning and guidance:
Preparation: Before the meeting, the person leading it should gather and review all key project documents, like the initial business case, status reports, budget information, and the project timeline. This provides an objective, data-based foundation for the discussion.53
Agenda: The meeting should be structured around key questions 51:
Evaluation of Project Goals: Did we achieve the goals we set? Were the goals themselves the right ones?
Review of Project Timeline: Did we meet our deadlines? If not, what caused the delays? Where were our estimates wrong?
Budget Analysis: Did we stay within budget? What caused any overspending? Were there any unexpected costs?
Team and Process Review: How well did the team work together? Was our communication effective? What were the biggest problems or frustrations in our workflow?
Facilitation: It's very important to create a "blameless" environment. The focus of a post-mortem should be on improving processes, not on blaming individuals.51 A good facilitator, who can be a neutral person from outside the project, keeps the conversation constructive, encourages everyone to participate, and makes sure the discussion stays focused on learning and improvement.51
9.3 From Insights to Action
A post-mortem meeting that doesn't lead to real action is a waste of time. The final and most important step is to turn the "lessons learned" into a formal, written action plan.51 This plan should outline specific, measurable, and actionable steps the organization will take to repeat its successes and avoid making the same mistakes again. For example, if a post-mortem shows that scope creep was a big problem, an action item might be "Update the standard project plan template to require a sign-off on the WBS from key people before work begins." These action items should be assigned to someone with a deadline to ensure they get done.
The project lifecycle is not a straight line but a circle. The results of the post-mortem from one project—the written lessons learned and the updated company processes—become the key inputs for the next project. When a new project starts, the process of identifying risks should begin by reviewing the lessons learned from similar past projects, as this provides the most valuable information on what is likely to go wrong.33 Similarly, the ideation and planning stages are improved by understanding past successes and failures. By failing to "close the loop" and formally use these lessons, a company is doomed to make the same mistakes over and over. A truly effective project framework is therefore a cycle, designed not just to manage individual projects but to build a learning organization that gets better and more efficient with every project it does.
Conclusion: The Complete Framework - A Master Checklist for Success
This report has laid out a complete, step-by-step framework for managing a project from its very beginning to its very end. It has shown that successful project management is not just one skill but a combination of many, a structured process that connects creative ideas with careful planning, flexible execution, and thoughtful learning. The journey from an idea to a finished product is complex, but by following a systematic path, companies can greatly increase their chances of success.
To put this entire framework into a practical, usable tool, the following master checklist is provided. It serves as a real "template" for thinking about and managing any general project, organized by the four main phases of a project's life. Each checklist item is a key action or document, with references to the relevant chapters in this report for a more detailed explanation. This checklist is designed to be a project leader's constant guide, making sure that no critical step is missed on the path to success.
Phase 1: Coming Up With and Evaluating Ideas
[ ] Get Ready for Brainstorming:
[ ] Send the problem/topic to the team ahead of time.1
[ ] Create a supportive, no-judgment environment.1
[ ] Generate Ideas Using Broad-Thinking Techniques (See Chapter 1):
[ ] Use Mind Mapping, Brainwriting, or Rapid Ideation to come up with lots of ideas.1
[ ] Refine and Test Ideas Using Narrow-Thinking Techniques (See Chapter 1):
[ ] Pick the best ideas and use Starbursting to look for weaknesses.2
[ ] Use the Five Whys or Drivers Analysis to make sure the idea solves a real problem.2
[ ] Do a Formal Feasibility Study (See Chapter 2):
[ ] Check if it's Technically possible.14
[ ] Check if it's Economically smart (Cost-Benefit/ROI).13
[ ] Check if it's Legally okay.14
[ ] Check if it's Operationally practical.12
[ ] Check if the Schedule is realistic.14
[ ] Prioritize Good Ideas Using a Prioritization Tool (See Chapter 2):
[ ] Use an Impact-Feasibility Matrix for a quick sort.15
[ ] Use a more detailed tool (like RICE or MoSCoW) to rank the best ideas.16
[ ] Confirm It Aligns with Company Goals:
[ ] Make sure the final chosen project helps the company's main goals.17
Phase 2: Planning and Designing the Project
[ ] Define the Project Goal Using the SMART Framework (See Chapter 3):
[ ] Make sure the goal is Specific, Measurable, Achievable, Relevant, and Time-bound.20
[ ] Develop the Work Breakdown Structure (WBS) (See Chapter 4):
[ ] Break the project goal down into major results, smaller results, and finally, work packages.24
[ ] Make sure the WBS follows the 100% Rule, covering all the work for the project.24
[ ] Get key people to approve the final WBS.25
[ ] Create the Resource Management Plan (See Chapter 5):
[ ] Estimate what you'll need (people, money, equipment) for each work package.28
[ ] Plan how you'll get and assign resources.29
[ ] Plan for your team's capacity to make sure workloads are fair.27
[ ] Develop the Risk Management Plan (See Chapter 6):
[ ] Identify potential risks and write them down in a risk register.32
[ ] Analyze and prioritize risks using a risk matrix.36
[ ] Define how you'll respond (Avoid, Mitigate, Transfer, Accept) to high-priority risks.36
[ ] Develop the Communication Plan (See Chapter 6):
[ ] Identify everyone involved and what information they need.42
[ ] Define how, how often, and who will handle all project communications.39
Phase 3: Doing the Work and Tracking Progress
[ ] Choose and Use a Project Management Method (See Chapter 7):
[ ] Pick the right method (e.g., Waterfall, Scrum, Kanban) based on the project's needs.43
[ ] Do the Project Work:
[ ] Lead and manage the project team according to the chosen method and plan.54
[ ] Monitor and Track Progress (See Chapter 8):
[ ] Use tracking tools like Gantt charts and Kanban boards.46
[ ] Track key numbers and KPIs (e.g., Schedule Variance, Cost Variance, Percent Complete).26
[ ] Report on Project Status:
[ ] Send out regular status reports to key people as defined in the communication plan.49
[ ] Manage Changes and Risks:
[ ] Use your risk response plans when needed.
[ ] Follow a formal process to manage any changes to the project's scope, schedule, or budget.34
Phase 4: Finishing Up and Learning
[ ] Formally Close the Project (See Chapter 9):
[ ] Get final approval of the work.
[ ] Close out all contracts and paperwork.
[ ] Release the project team and resources.
[ ] File away all project documents.
[ ] Hold a Project Post-Mortem / Review (See Chapter 9):
[ ] Lead a "blameless" meeting to review how the project went (goals, schedule, budget).51
[ ] Discuss what went well, what went wrong, and why.
[ ] Document and Use Lessons Learned (See Chapter 9):
[ ] Create a formal "lessons learned" document.
[ ] Develop a clear action plan to use these lessons in future projects.53
[ ] Update company processes and templates to "close the loop" and ensure you're always getting better.
Works cited
10 effective brainstorming techniques for teams - WeWork, accessed on July 16, 2025, https://www.wework.com/ideas/professional-development/creativity-culture/effective-brainstorming-techniques
29 Brainstorming Techniques for Better Brainstorms [2025] • Asana, accessed on July 16, 2025, https://asana.com/resources/brainstorming-techniques
Brainstorming Techniques: 5 Effective Techniques for Project | The ..., accessed on July 16, 2025, https://www.atlassian.com/work-management/project-collaboration/brainstorming/brainstorming-techniques
Get inspired with these 13 mind map examples - Meister - MeisterTask, accessed on July 16, 2025, https://www.meistertask.com/blog/mind-map-examples
MindMeister: Create Your Mind Maps Online - On Any Device, accessed on July 16, 2025, https://www.mindmeister.com/
How to use reverse brainstorming with your team - Mural, accessed on July 16, 2025, https://www.mural.co/blog/reverse-brainstorming
Reverse Brainstorming Template - Miro, accessed on July 16, 2025, https://miro.com/templates/reverse-brainstorming/
Find unexpected solutions with Reverse Brainstorming - YouTube, accessed on July 16, 2025, https://m.youtube.com/watch?v=tEKb4ManS6w&pp=ygUJI21pcm90aG9u
bigbangpartnership.co.uk, accessed on July 16, 2025, https://bigbangpartnership.co.uk/scamper/#:~:text=The%20SCAMPER%20technique%20is%20a,use%2C%20Eliminate%2C%20and%20Reverse.
SCAMPER - The Decision Lab, accessed on July 16, 2025, https://thedecisionlab.com/reference-guide/philosophy/scamper
The SCAMPER Technique for Creative Problem Solving - The Big Bang Partnership, accessed on July 16, 2025, https://bigbangpartnership.co.uk/scamper/
How to Create a Feasibility Report for Project Management - PSOhub, accessed on July 16, 2025, https://www.psohub.com/blog/feasibility-report-project-management
Feasibility Study: What It Is, Benefits, and Examples - Investopedia, accessed on July 16, 2025, https://www.investopedia.com/terms/f/feasibility-study.asp
Feasibility Study: Types, Importance, Benefits, and Tools - Simplilearn.com, accessed on July 16, 2025, https://www.simplilearn.com/feasibility-study-article
Impact-Feasibility Matrix - NetZeroCities Portal, accessed on July 16, 2025, https://netzerocities.app/resource-598
Perfect Project Prioritization In New Product Development: 14 Criteria, accessed on July 16, 2025, https://www.itonics-innovation.com/blog/perfect-project-prioritization
How to Prioritize Projects in 6 Simple Steps - Float, accessed on July 16, 2025, https://www.float.com/resources/how-to-prioritize-projects
Top 10 Project Management Best Practices - OnePlan, accessed on July 16, 2025, https://oneplan.ai/articles/project-management-best-practices/
SMART Goals for Project Managers: 8 Examples - Teamly, accessed on July 16, 2025, https://www.teamly.com/blog/smart-goals-for-project-managers/
What is SMART Goal Setting? | Definition and Overview - ProductPlan, accessed on July 16, 2025, https://www.productplan.com/glossary/smart-goal-setting/
SMART Goals for Project Managers - Smartsheet, accessed on July 16, 2025, https://www.smartsheet.com/content/project-management-smart-goals
The Ultimate Guide to S.M.A.R.T. Goals – Forbes Advisor, accessed on July 16, 2025, https://www.forbes.com/advisor/business/smart-goals/
Work breakdown structures overview | Microsoft Learn, accessed on July 16, 2025, https://learn.microsoft.com/en-us/dynamics365/project-operations/prod-pma/work-breakdown-structures
What is a Work Breakdown Structure? [+How to Make One] | The ..., accessed on July 16, 2025, https://www.atlassian.com/work-management/project-management/work-breakdown-structure
How to use a work breakdown structure (WBS) - Adobe Experience Cloud, accessed on July 16, 2025, https://business.adobe.com/blog/basics/what-is-work-breakdown-structure
Project Management Best Practices - Management Consulted, accessed on July 16, 2025, https://managementconsulted.com/project-management-best-practices/
Resource Management: Process, Tools & Techniques - ProjectManager, accessed on July 16, 2025, https://www.projectmanager.com/blog/quick-guide-resource-management
What is Project Resource Management, and How to Master it?, accessed on July 16, 2025, https://www.saviom.com/blog/project-resource-management-an-ultimate-guide-on-how-to-master-it/
A Comprehensive Guide to Project Resource Management - Invensis Learning, accessed on July 16, 2025, https://www.invensislearning.com/blog/what-is-project-resource-management/
What is Resource Management and Why Is It Important? - Planview, accessed on July 16, 2025, https://www.planview.com/resources/guide/resource-management-software/resource-management-leverage-people-budgets/
What Is Project Resource Management? And Why Bother? - Ganttic, accessed on July 16, 2025, https://www.ganttic.com/blog/what-is-resource-management
Risk Mitigation Strategies in Project Management | The Workstream, accessed on July 16, 2025, https://www.atlassian.com/work-management/project-management/risk-mitigation
Risk Mitigation in Project Management - ProjectManager, accessed on July 16, 2025, https://www.projectmanager.com/blog/mitigate-risk-project
What is Project Execution Strategy? Steps, Tools, & Pro Tips | JOP, accessed on July 16, 2025, https://www.getjop.com/blog/project-execution-strategies
Four Risk Mitigation Strategies for Effective Project Management - ARMA Magazine, accessed on July 16, 2025, https://magazine.arma.org/2023/02/four-risk-mitigation-strategies-for-effective-project-management/
Project Risk Management: Strategies, Tools, and Best Practices - SixSigma.us, accessed on July 16, 2025, https://www.6sigma.us/six-sigma-in-focus/project-risk-management/
What is Risk Mitigation? The Four Types and How to Apply Them - MHA Consulting, accessed on July 16, 2025, https://mha-it.com/blog/four-types-of-risk-mitigation
Project Management Communications Plan Template and - wsdot, accessed on July 16, 2025, https://www.wsdot.wa.gov/publications/fulltext/ProjectMgmt/Website/ProjectManagement-CommunicationsPlanTemplate.docx
How to Write an Effective Communication Plan [2025] - Asana, accessed on July 16, 2025, https://asana.com/resources/communication-plan
Project Management Communication Plan Template & Tutorial - TeamGantt, accessed on July 16, 2025, https://www.teamgantt.com/blog/project-management-communication-plan
How to Create a Project Communication Plan (Template Included) - Project Manager, accessed on July 16, 2025, https://www.projectmanager.com/blog/project-management-communication-plan
How to Create an Effective Project Communication Plan - SixSigma.us, accessed on July 16, 2025, https://www.6sigma.us/project-management/project-communication-plan/
Agile vs. Waterfall vs. Scrum vs. Kanban: What's the Difference?, accessed on July 16, 2025, https://www.wudpecker.io/blog/agile-vs-waterfall-vs-scrum-vs-kanban-whats-the-difference
Agile vs. Waterfall vs. Kanban vs. Scrum | Lucidchart Blog, accessed on July 16, 2025, https://www.lucidchart.com/blog/agile-vs-waterfall-vs-kanban-vs-scrum
Agile, Waterfall, Scrum, and Kanban: An In-Depth Look with ..., accessed on July 16, 2025, https://vikramios.medium.com/agile-waterfall-scrum-and-kanban-an-in-depth-look-with-examples-cb9302a3dcfc
How Effective Project Tracking Transforms Team Productivity | Slack, accessed on July 16, 2025, https://slack.com/blog/collaboration/top-methods-and-metrics-for-tracking-project-progress
Project Tracker: The Ultimate Guide to Project Tracking - Project Manager, accessed on July 16, 2025, https://www.projectmanager.com/guides/project-tracker
7 Strategies for Effective Project Management Tracking - Revelo, accessed on July 16, 2025, https://www.revelo.com/blog/project-tracking
How to Track Projects Effectively [2025] - Asana, accessed on July 16, 2025, https://asana.com/resources/what-is-project-tracking
What's the Best Way to Track and Communicate Project Progress? - AchieveIt, accessed on July 16, 2025, https://www.achieveit.com/resources/blog/whats-the-best-way-to-track-and-communicate-project-progress/
Project Post-Mortems: Navigating for Future Success | Mailchimp, accessed on July 16, 2025, https://mailchimp.com/resources/project-post-mortem/
productive.io, accessed on July 16, 2025, https://productive.io/blog/project-post-mortem/#:~:text=The%20benefits%20of%20a%20post,team%20collaboration%20for%20upcoming%20projects.
8 easy to follow steps to conduct a project review - PM Majik, accessed on July 16, 2025, https://www.pmmajik.com/8-easy-to-follow-steps-to-conduct-a-project-review/
Project Executing Made Simple: Best Practices For Managers - rosemet, accessed on July 16, 2025, https://www.rosemet.com/project-executing/
No comments:
Post a Comment